Capacity Market Register

Download Data:

Viewing: Components Data

Auction NameCMU IDComponent IDDelivery YearTypeGenerating Technology ClassPermitted on-Site Generating UnitPrimary Fuel of ComponentConnection / DSR CapacityDe-Rated CapacityPre-Refurbishing De-Rated CapacityPost-Refurbishing De-Rated CapacityGenerating Capacity of on-site Generating UnitDescription of CMU ComponentsLocation and Post CodeOS Grid Reference
2025-26 (T-1) One Year Ahead Capacity AuctionK322421C22422025T-1Storage (Duration 4h)Storage - Battery4021.668Lithium ion battery storage plantadjacent to Kilmarnock South Substation KA1 3TNNS 445 341
2025-26 (T-1) One Year Ahead Capacity AuctionLEL_24LWCMU12025T-1Energy from WasteWaste2017.606Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.EcoPark, Advent Way, Edmonton, London N18 3AGTQ 357 926
2025-26 (T-1) One Year Ahead Capacity AuctionDAL005DAL0052025T-1Onshore WindOnshore Wind423.23810 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, ScotlandDalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NNNS 795 337
2025-26 (T-1) One Year Ahead Capacity AuctionCumb24CUMBERH2025T-1Onshore WindOnshore Wind503.855Existing generation windfarm.Cumberhead Wind Farm, Douglas, Lanark, ML11 0SYNS 815 404
2025-26 (T-1) One Year Ahead Capacity AuctionSG--28ESGL272025T-1Energy from WasteWaste4539.614SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RRSE 334 312
2025-26 (T-1) One Year Ahead Capacity AuctionKL--28EKVL272025T-1Energy from WasteWaste49.943.927Kelvin is an energy-from-waste facility which is currently under construction with scheduled commissioning in 2025. A connection offer has been accepted with Western Power Distribution.enfinium Kelvin Limited, Giffords Way (off Kelvin Way), West Bromwich, B70 7JRSP 003 899
2025-26 (T-1) One Year Ahead Capacity AuctionSKEL25SKELXL2025T-1Storage (Duration 2h)Storage - Battery42.70111.593An existing battery energy storage system.Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQSD 466 076
2025-26 (T-1) One Year Ahead Capacity AuctionNBBLK4BLKFB-12025T-1Storage (Duration 2h)Storage - Battery10027.15200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.Netherton Farm, Keith AB55 5PENJ 435 478
2025-26 (T-1) One Year Ahead Capacity AuctionNBBLK4BLKFB-22025T-1Storage (Duration 2h)Storage - Battery10027.15200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU'sNetherton Farm, Keith AB55 5PENJ 435 478
2025-26 (T-1) One Year Ahead Capacity AuctionFORF25FORF252025T-1Storage (Duration 1.5h)Storage - Battery9.9992.033This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TDNO 440 502
2025-26 (T-1) One Year Ahead Capacity AuctionBRAC24BRAC242025T-1Storage (Duration 1.5h)Storage - Battery9.9992.033New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RANN 805 097
2025-26 (T-1) One Year Ahead Capacity AuctionF240120120012025T-1Combined Heat and Power (CHP)Gas1.5891.445Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposesStubbins Hall Lane Waltham Abbey Essex EN9 2EETL 380 029
2025-26 (T-1) One Year Ahead Capacity AuctionF240130130012025T-1Combined Heat and Power (CHP)Gas32.7292 x gas fired CHP generators located at a horticultural site.17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SSTL 329 687
2025-26 (T-1) One Year Ahead Capacity AuctionF210180180012025T-1Combined Heat and Power (CHP)Gas1.91.728one CHP (1.9MW rating) in a horticulatural environment with no aux loadNorthmoor Lane, Cottingham, Hull HU16 4JNTA 055 342
2025-26 (T-1) One Year Ahead Capacity AuctionTWESH2T_TWSHW-12025T-1Onshore WindOnshore Wind37.82.9149-turbine wind farm located in Scotland with the installed capacity of 37.800MWCraigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, ScotlandNS 806 070
2025-26 (T-1) One Year Ahead Capacity AuctionFER251FBB8TB2025T-1Storage (Duration 2h)Storage - Battery142.538.689The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TBSE 478 251
2025-26 (T-1) One Year Ahead Capacity AuctionHHPL252_FBPGM0022025T-1Storage (Duration 2h)Storage - Battery47.2712.834A Lithium Ion Energy Storage SystemLAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DRNZ 386 459
2025-26 (T-1) One Year Ahead Capacity AuctionWINDY2T_WDRGW-12025T-1Onshore WindOnshore Wind42.83.312-turbine wind farm located in Scotland with the installed capacity of 43.200MWC35, Castle Douglas , Scotland, DG7 3UFNX 651 965
2025-26 (T-1) One Year Ahead Capacity AuctionCDROC3CDROC12025T-1Reciprocating enginesGas54.675Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plantRochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZTQ 746 695
2025-26 (T-1) One Year Ahead Capacity Auction25AVONNB_3082025T-1Storage (Duration 1h)Storage - Battery101.364Existing Generator Battery Energy Storage SystemPlot B at Severn Road Avonmouth BS10 7SEST 543 812
2025-26 (T-1) One Year Ahead Capacity AuctionSKYL01T_SOKYW-12025T-1Onshore WindOnshore Wind23518.11950 Turbine onshore wind farm with a gross installed capacity of 240 MW in East Ayrshire, ScotlandSouth Kyle Wind Farm, New Cumnock (off B741), Dalmellington, Ayr, KA6 7FPNS 548 063
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000012025T-1DSRBTM residential IoT flexibilitySA48
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000022025T-1DSRBTM residential IoT flexibilityAB16
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000032025T-1DSRBTM residential IoT flexibilityGU4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000042025T-1DSRBTM residential IoT flexibilityAB24
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000052025T-1DSRBTM residential IoT flexibilityCF83
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000062025T-1DSRBTM residential IoT flexibilityM44
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000072025T-1DSRBTM residential IoT flexibilityHA5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000082025T-1DSRBTM residential IoT flexibilityAL5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000092025T-1DSRBTM residential IoT flexibilitySS5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000102025T-1DSRBTM residential IoT flexibilitySS5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000112025T-1DSRBTM residential IoT flexibilityCO4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000122025T-1DSRBTM residential IoT flexibilityPE37
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000132025T-1DSRBTM residential IoT flexibilityNR20
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000142025T-1DSRBTM residential IoT flexibilityNR8
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000152025T-1DSRBTM residential IoT flexibilityCM23
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000162025T-1DSRBTM residential IoT flexibilityCM24
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000172025T-1DSRBTM residential IoT flexibilityCB10
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000182025T-1DSRBTM residential IoT flexibilityPE14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000192025T-1DSRBTM residential IoT flexibilityIP2
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000202025T-1DSRBTM residential IoT flexibilityIP31
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000212025T-1DSRBTM residential IoT flexibilityN8
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000222025T-1DSRBTM residential IoT flexibilityNR13
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000232025T-1DSRBTM residential IoT flexibilityCM0
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000242025T-1DSRBTM residential IoT flexibilityAL4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000252025T-1DSRBTM residential IoT flexibilityPE24
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000262025T-1DSRBTM residential IoT flexibilityNG9
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000272025T-1DSRBTM residential IoT flexibilityMK18
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000282025T-1DSRBTM residential IoT flexibilityMK14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000292025T-1DSRBTM residential IoT flexibilityMK2
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000302025T-1DSRBTM residential IoT flexibilityLE9
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000312025T-1DSRBTM residential IoT flexibilityLE16
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000322025T-1DSRBTM residential IoT flexibilityCV12
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000332025T-1DSRBTM residential IoT flexibilityCV5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000342025T-1DSRBTM residential IoT flexibilityCV23
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000352025T-1DSRBTM residential IoT flexibilityDE13
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000362025T-1DSRBTM residential IoT flexibilityLE3
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000372025T-1DSRBTM residential IoT flexibilityCV47
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000382025T-1DSRBTM residential IoT flexibilitySE27
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000392025T-1DSRBTM residential IoT flexibilityW14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000402025T-1DSRBTM residential IoT flexibilitySE9
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000412025T-1DSRBTM residential IoT flexibilitySW12
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000422025T-1DSRBTM residential IoT flexibilitySW17
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000432025T-1DSRBTM residential IoT flexibilitySE22
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000442025T-1DSRBTM residential IoT flexibilitySW15
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000452025T-1DSRBTM residential IoT flexibilityWA4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000462025T-1DSRBTM residential IoT flexibilityCH60
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000472025T-1DSRBTM residential IoT flexibilitySY4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000482025T-1DSRBTM residential IoT flexibilityCH5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000492025T-1DSRBTM residential IoT flexibilityWA2
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000502025T-1DSRBTM residential IoT flexibilityWA4
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000512025T-1DSRBTM residential IoT flexibilityGL52
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000522025T-1DSRBTM residential IoT flexibilityGL14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000532025T-1DSRBTM residential IoT flexibilityCW12
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000542025T-1DSRBTM residential IoT flexibilityB91
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000552025T-1DSRBTM residential IoT flexibilityGL15
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000562025T-1DSRBTM residential IoT flexibilityDY14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000572025T-1DSRBTM residential IoT flexibilityB74
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000582025T-1DSRBTM residential IoT flexibilityWS7
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000592025T-1DSRBTM residential IoT flexibilityGL2
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000602025T-1DSRBTM residential IoT flexibilityST19
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000612025T-1DSRBTM residential IoT flexibilityDY14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000622025T-1DSRBTM residential IoT flexibilityHR5
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000632025T-1DSRBTM residential IoT flexibilityTS14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000642025T-1DSRBTM residential IoT flexibilityTS12
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000652025T-1DSRBTM residential IoT flexibilityDL10
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000662025T-1DSRBTM residential IoT flexibilityOL3
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000672025T-1DSRBTM residential IoT flexibilitySK22
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000682025T-1DSRBTM residential IoT flexibilityOL11
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000692025T-1DSRBTM residential IoT flexibilityPR2
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000702025T-1DSRBTM residential IoT flexibilityBB12
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000712025T-1DSRBTM residential IoT flexibilityM41
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000722025T-1DSRBTM residential IoT flexibilityBL6
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000732025T-1DSRBTM residential IoT flexibilityKW14
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000742025T-1DSRBTM residential IoT flexibilityG63
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000752025T-1DSRBTM residential IoT flexibilityEH49
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000762025T-1DSRBTM residential IoT flexibilityKA11
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000772025T-1DSRBTM residential IoT flexibilityFK7
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000782025T-1DSRBTM residential IoT flexibilityEH41
2025-26 (T-1) One Year Ahead Capacity AuctionVOLT_10000792025T-1DSRBTM residential IoT flexibilityFK2